Announcement
Collapse
No announcement yet.
Partner 728x90
Collapse
NinjaTrader
unable to change order
Collapse
X
-
unable to change order
I have created an EMA bounce strategy, with parabolic SL, however I find myself with the problem that I leave evidence in the image, consulting the forums I see that it is possible for very short SLs, however I lengthen the value of these and it continues to give me the same problem
Tags: None
-
I add the code used
namespace NinjaTrader.NinjaScript.Strategies
{
public class ReboteParabolico : Strategy
{
private EMA EMA1;
private HMA HMA1;
protected override void OnStateChange()
{
if (State == State.SetDefaults)
{
Description = @"Enter the description for your new custom Strategy here.";
Name = "ReboteParabolico";
Calculate = Calculate.OnPriceChange;
EntriesPerDirection = 1;
EntryHandling = EntryHandling.AllEntries;
IsExitOnSessionCloseStrategy = true;
ExitOnSessionCloseSeconds = 600;
IsFillLimitOnTouch = false;
MaximumBarsLookBack = MaximumBarsLookBack.TwoHundredFiftySix;
OrderFillResolution = OrderFillResolution.High;
OrderFillResolutionType = BarsPeriodType.Minute;
OrderFillResolutionValue = 1;
Slippage = 0;
StartBehavior = StartBehavior.WaitUntilFlat;
TimeInForce = TimeInForce.Day;
TraceOrders = false;
RealtimeErrorHandling = RealtimeErrorHandling.StopCancelClose;
StopTargetHandling = StopTargetHandling.PerEntryExecution;
BarsRequiredToTrade = 20;
// Disable this property for performance gains in Strategy Analyzer optimizations
// See the Help Guide for additional information
IsInstantiatedOnEachOptimizationIteration = true;
Inicio = DateTime.Parse("01:25", System.Globalization.CultureInfo.InvariantCulture) ;
Fin = DateTime.Parse("16:00", System.Globalization.CultureInfo.InvariantCulture) ;
EmaP = 50;
HmaP = 50;
Trailing = 80;
}
else if (State == State.Configure)
{
}
else if (State == State.DataLoaded)
{
EMA1 = EMA(Close, Convert.ToInt32(EmaP));
HMA1 = HMA(Close, Convert.ToInt32(HmaP));
EMA1.Plots[0].Brush = Brushes.BurlyWood;
HMA1.Plots[0].Brush = Brushes.Goldenrod;
AddChartIndicator(EMA1);
AddChartIndicator(HMA1);
SetParabolicStop(CalculationMode.Ticks, Trailing);
}
}
protected override void OnBarUpdate()
{
if (BarsInProgress != 0)
return;
if (CurrentBars[0] < 1)
return;
// Set 1
if (
// InicioFin
((Times[0][0].TimeOfDay > Inicio.TimeOfDay)
&& (Times[0][0].TimeOfDay < Fin.TimeOfDay))
&& (Position.MarketPosition == MarketPosition.Flat)
// Condition group 1
&& ((BarsSinceExitExecution(0, "", 0) == -1)
|| (BarsSinceExitExecution(0, "", 0) > 1))
&& (Close[1] > EMA1[1])
&& (Low[0] <= EMA1[0])
&& (HMA1[0] > EMA1[0])
&& (Open[0] > EMA1[0]))
{
Draw.ArrowUp(this, Convert.ToString(Close[0]), false, 0, (Low[0] - 5) , Brushes.DodgerBlue);
BarBrush = Brushes.DodgerBlue;
EnterLong(Convert.ToInt32(DefaultQuantity), "");
}
// Set 2
if (
// InicioFin
((Times[0][0].TimeOfDay > Inicio.TimeOfDay)
&& (Times[0][0].TimeOfDay < Fin.TimeOfDay))
&& (Position.MarketPosition == MarketPosition.Flat)
// Condition group 1
&& ((BarsSinceExitExecution(0, "", 0) == -1)
|| (BarsSinceExitExecution(0, "", 0) > 1))
&& (Close[1] < EMA1[1])
&& (High[0] >= EMA1[0])
&& (HMA1[0] < EMA1[0])
&& (Open[0] < EMA1[0]))
{
Draw.ArrowDown(this, Convert.ToString(Close[0]), false, 1, (High[0] + 5) , Brushes.OrangeRed);
BarBrush = Brushes.OrangeRed;
EnterShort(Convert.ToInt32(DefaultQuantity), "");
}
}
-
Hello Marioroa,
Thanks for your notes.
This error message indicates that you are changing an order to the wrong side of the market.
Prints should be added to the script to understand exactly how your logic in the script is behaving. Add prints to the script that print out the logic being used to place orders and print out the order object in OnOrderUpdate() to see how the orders are evaluating and being placed. Also, enable TraceOrders to better understand how the orders are behaving.
Below is a link to a forum post that demonstrates how to use prints to understand behavior.
OnOrderUpdate(): https://ninjatrader.com/support/helpGuides/nt8/onorderupdate.htm
If this is due to market volatility then there isn't really a way to 100% avoid this occurring, as in volatile markets the market could move so far and fast that this would occur.
Something you could consider is using GetCurrentBid() and GetCurrentAsk() to offset orders so that they are more likely to land on the correct side of the market.
See these help guide pages for more information.
GetCurrentBid(): https://ninjatrader.com/support/help...currentbid.htm
GetCurrentAsk(): https://ninjatrader.com/support/help...currentask.htm
You could also consider using RealtimeErrorHandling.IgnoreAllErrors to trap order errors in OnOrderUpdate by checking error == ErrorCode.UnableToChangeOrder.
Please note that setting this property value to IgnoreAllErrors can have serious adverse affects on a running strategy unless you have programmed your own order rejection handling in the OnOrderUpdate() method. To do this you could trap the rejected order by checking if the OrderState is Rejected within OnOrderUpdate() followed by defining your own order rejection handling behavior for the rejected order.
Please see the example in the help guide link below that demonstrates using RealtimeErrorHandling and trapping a rejected order in OnOrderUpdate().
RealtimeErrorHandling — https://ninjatrader.com/es/support/h...orhandling.htm
If you are backtesting the strategy in the Strategy Analyzer, you should also keep in mind that there is no intrabar granularity available. You could add intrabar granularity to the script by adding a 1-Tick data series to the script, submit orders to the 1-Tick secondary series, and enable Tick Replay.
Please review the help guide document on the differences on real-time vs backtest (historical).
See more information about granularity here: http://ninjatrader.com/support/forum...297#post491297<span class="name">Brandon H.</span><span class="title">NinjaTrader Customer Service</span><iframe name="sig" id="sigFrame" src="/support/forum/core/clientscript/Signature/signature.php" frameborder="0" border="0" cellspacing="0" style="border-style: none;width: 100%; height: 120px;"></iframe>
Comment
Latest Posts
Collapse
| Topics | Statistics | Last Post | ||
|---|---|---|---|---|
|
Started by CaptainJack, 05-29-2026, 05:09 AM
|
0 responses
477 views
0 likes
|
Last Post
by CaptainJack
05-29-2026, 05:09 AM
|
||
|
Started by CaptainJack, 05-29-2026, 12:02 AM
|
0 responses
317 views
0 likes
|
Last Post
by CaptainJack
05-29-2026, 12:02 AM
|
||
|
Started by charlesugo_1, 05-26-2026, 05:03 PM
|
0 responses
255 views
1 like
|
Last Post
by charlesugo_1
05-26-2026, 05:03 PM
|
||
|
Started by DannyP96, 05-18-2026, 02:38 PM
|
1 response
340 views
0 likes
|
Last Post
|
||
|
Started by CarlTrading, 05-11-2026, 05:56 AM
|
0 responses
306 views
0 likes
|
Last Post
by CarlTrading
05-11-2026, 05:56 AM
|

Comment