eg, I have selected a range of values for parameter "A". That range is 1 to 3, and using a step value of 1. The item I have selected in "Optimize on" is "Max net profit". I then click the "Run" button. The "Results" section then shows that the value of 3 for parameter "A" produced the highest max net profit. (This is the current method.)
What would be nice is if the SA then took the next step and iterated the range. eg, to then automatically set the range to be 2 to 4, then run again. If 4 produced the highest net profit, then automatically set the range to 3 to 5, etc.
So, this particular iteration of the range would keep iterating until the max net profit value is reached.
Comment