When I run my strategy, SA is processing and displaying results for dates beyond the end date I set.
Attached is a picture showing what I am referring to. I set the end date to 11/20/2019, but SA processes all dates up through 03/09/2020. Not shown, but the instrument the backtest was run on was MES 06-20. Now, if I change the Instrument to MES 03-20, I get the same results, but if I change it to MES 12-19, then SA processes through 12/19/2019, even though the end date is still set to 11/20/2019.
So, it seems like SA is ignoring the end date setting and just processing all the data in the DB for the selected instrument contract.
Is there any other setting I might not be aware of that could cause this?
Thanks,
Chaz
Comment