In the image below, at the green arrow, I start computing a moving average at a specific date and time. However, you can see that I have a moving average at the left of this date (red arrow) which is not computed.
I'm wondering how I can plot only the moving average starting at the same date and time than I begin to compute. I don't want anything showing up at the left of it.
I've searched a lot in this forum and I didn't find much to help me out with this.
Regards,

Comment