I have a strategy that I want to test with walk forward.
I have watched a few videos and tried to get my head around the setup.
I have firstly downloaded 1 year of historical data (i think) using the historical data manager, I have then gone into the strategy analyzer and selected the current ES 09-16 contract but this is where I am confused. If I want to run walk forward for 6 months do I need to select the ES contact 6 months ago and set the dates from this time up to the date today, I try and run the walk forward but keeps getting "there are no walk forward results available since the strategy has no parameters to optimize and walk forward"
Help please!
Comment