I've been testing a system in the WFO, and given the good results, I decided to investigate whether everything was correct. First prepare the WFO:

Y setup the optimization in 2 days and the test in only one. And these were the results:

I first checked if the date of the test was okay, but it is not, begins the day before:

Then I checked if the optized dates were ok, but they are not too... It overlaps de test day!

So it optimize the day to test, and the results are a pure optimization, not an external test... and benefit, of course, was amazing.
What is wrong?
Greetings!

Comment